Grünbrücke A1 Bergland

Green bridge A1 Bergland

Project

Construction of the new green bridge A1 Bergland Erection of a falsework over the 6-lane A1 for the construction of the green bridge Bergland over the motorway.
Verification of the static calculations of the falsework and the end platforms by means of an independent comparative calculation.
Acceptance of the falsework and end platforms on site as well as verification of the conformity of the constructions with the verified stand calculation.
2015

Principal

Werner Consult Ziviltechniker GmbH

Building owner

ASFINAG Autobahnen- und Schnellstraßen-Finanzierungs-AG